From: route@monster.com
Sent: Thursday, April 07, 2016 12:03 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
ENDURANCE AITUFE, Msc Project Planner & Scheduler /
Electrical & Electronics Engineer 3400 WOODCHASE DR, APT 2324Phone:
281-975-8404 HOUSTON, TX 77083 Email:
enduranceaitufe@hotmail.com SUMMARY
A competent Electrical Engineer / Project
Scheduler with over 5 years of rewarding international experience in
electrical and electronics engineering, project planning & Scheduling.
Expert in planning software: Primavera P6, Microsoft project, and Primavera
Risk Analysis. A Skilled IT administrator Excellent Communicator,
forecasting, progress measurement, cost reporting, change/trend reporting,
reviewing and updating estimates, coordinating with procurement and
accounting to properly capture/classify project costs. SKILLS
Ø Proficiency in Microsoft Office Suites including Microsoft
Project Ø Proficiency in Primavera P6 Ø Schedule analytical software and system Ø Knowledge in Multism, Matlab, VHDL and Proteus Ø AutoCAD 2D&3D design Ø
Good Team working and communication skills. CERTIFICATIONS
Primavera P6
Certification EDUCATION
Ø
Master
of Science (MSc): Electrical and Electronics Engineering (Credential
Evaluated)
Coventry University – Coventry, England. Ø
Bachelors
in Engineering (B.Eng): Electrical and Electronics Engineering (Credential Evaluated)
Ambrose Alli University - Ekpoma, Edo State, Nigeria Ø
West
Africa Examination Certficate:
Ambrose Alli University Secondary School - Ekpoma, Edo State, Nigeria. WORKING EXPERIENCE
Project Engineer – Scheduling P6 Global Inspection Engineering Services Houston, TX December 2014 to Present •Full-time hands-on P6 scheduling and
resource management. •Using Primavera for Preparing Schedules, Monthly Progress
Report For Project Proposal & Detail Design. •Interface with Project team,
subcontractors, and clients to enable exchange of information necessary to
perform quality schedule, risk, and cost and resource management. •Implement all data for project reporting
functions, Produce reports and analyses related to the Project schedule. •Critical Path Analysis. •Managing and controlling recovery plans. •Developing and maintaining resources
loaded & manpower histogram. •Generating Man-Hours Curve, progress
S-curve, Forecast. •Monitoring and updating the Schedule
(earned Value reports ). •Reporting to the project Manager the
Project Current status based on the progress Planned Vs Actual. •Updating Three Weeks Look Ahead and key
Milestones. Specialist, Planning and Scheduling
Engineer TechnoColor Rugby, England January 2014 to October 2014 · Used Primavera
P6 to Prepare Schedules, Monthly Progress Report For Project Proposal
& Detail Design. · Developed baseline project schedules with input from
multiple work groups · Maintained project schedules and provided progress updates
as required · Prepared and maintained status on individual task detailed
schedules and integrates tasks into master schedules. · Prepared S-curves on cumulative progress · Ensured project activities are logically tied - provided
sequencing recommendation · Attended project meetings to obtain cost and schedule
updates · Prepared manpower histograms and resource leveling · Developed summary cost & schedule reports for senior
management · Interface with field and division leaders to receive cost
& schedule updates · Identified critical project metrics to track in order to
monitor project progress · Provided cost and schedule forecasts · Performed project closeout with summary cost and schedule
statistics · Performed job audits to validate actual progress vs.
reported · Make presentations to clients/stakeholders on project
controls Electrical Engineer/Project Scheduler Transmission Company of Nigeria Benin, Nigeria September 2011 to June 2013 · Performed vibration qualification, reliability testing,
and sensor data validation, both mechanical and electrical, of
downhole tools and surface equipment over wide temperature and pressure
range. · Performed research and development to generate technical
papers and intellectual property. · Project planning, scheduling and controls with the use of Primavera P6 · Developed wiring diagram and schematics for low voltage
power supply to all active sensors at surface equipment and downhole. · Designed instrumentation and controls for remote monitoring
and diagnostics of oil well sensor data at the operator's cabin at surface
(ATEX, NEC, IEC, CE) · Developed baseline project schedules using Microsoft
Project with input from multiple work groups · Maintained project schedules and provided progress updates
as required · Prepared and maintained status on individual task detailed
schedules · Ensured project activities are logically tied - provided
sequencing recommendation · Attended project meetings to obtain schedule updates · Prepared manpower histograms and resource leveling · Developed summary schedule reports for senior management Maintenance Engineer HUAWEI TECH NIG LTD Abuja, Nigeria January 2010 to January 2011 · Monitor BSS network and ensure all preventive, corrective
and work orders are duly implemented with the aid of M2000 AND MOS5100 · Give remote support to Field Maintenance Engineers (FME)
to resolve Hardware issues by calling them twice daily and troubleshooting
with them to resolve issues that affect site availability and Performance
such as: VSWR alarm, RF Unit Maintenance Link Failure, Temperature Prompt
Alarm, Alarm Simulation. · Forwarding of alarms to the Back office and customer · Prepare daily reports such as Site Availability, site
fluctuation, and site outage reports with Microsoft excel and following up on
the issue for quick resolution. · Supervision of FME and ISM in carrying out preventive
maintenance on average of 50PM daily. Ensuring that all environmental alarms
and power alarms are properly simulated; also ensuring · that BTS equipment and power equipment on field are
thoroughly maintained. · Carrying out NOC preliminary acceptance tests for new
sites. · Isolation of traffic related alarms ,escalation and
clearance with FME. ADDITIONAL INFORMATION
PROFESSIONAL AFFILIATES Ø
Student
member of Institute of Electrical Electronics Engineers (IEEE) Ø
Society
of Petroleum Engineers (SPE) Ø
Engineer
In Training (EIT) exam preparation in progress. HOBBIES: Reading,
Football, and surfing the internet. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|